Add slabs, footings and round piers to estimate concrete volume, whole bags and material cost from your product yield.
12 m³
m
m
m
Lengths accept decimals, fractions like 1 1/2, and units like 12 in or 5' 6 1/2".
Order allowance
%
Covers spillage, uneven subgrade and form bulge.
Concrete to order
m³
2 m³ measured + 10% allowance
Bags of pre-mix184 bags
Each icon is 5 bags.
m³
Use the mixed yield printed on your bag, not its weight.
Measured volume
2 m³
Unused bag yield
0.008 m³
Other units
2.877 yd³ · 77.69 ft³
Material quantity only. Reinforcement, strength and structural design need their own check.
PriceOptional
Price basis
Per bag for pre-mix, or per volume for ready-mix delivered by truck.
Ordering concrete from a measured volume
A slab's volume is length × width × thickness. A round pier uses π × diameter² × height ÷ 4. Each pour is converted into metres before its volume is added to the job, so you can mix units between pours.
The order allowance is applied before rounding to whole bags. The example yield is a sample value. Replace it with the mixed yield printed on your product label. A bag's weight alone does not tell you how much concrete it makes.
This takeoff estimates material only. Site irregularities, reinforcement, strength and structural requirements need their own assessment.